Dynamic lane

Based on the theoretical average daily traffic intensity, the current total amount of traffic has increased by 78.61% since 1990. This increase in the volume of traffic will almost certainly lead to a deterioration in the level of traffic performance as the traffic handling load limit will be exceeded, particularly on certain days (approx. 20 days per year: every Saturday in the months of July and August, during the Christmas period and on the long weekends of Ascension Day, Corpus Christi and Whitsun) and when road works are carried out where there are currently two lanes, or when accidents occur.

On critical days, at peak times, more than 3,000 vehicles can be counted per hour with an average travel speed of 70-80 km/h, while during the course of a day, more than 40,000 vehicles can be counted.

The opening of a third lane by the temporary use of the emergency lane serves to efficiently manage emergency situations which may occur during such periods throughout the year as the third lane increases vehicle capacity (approx. 4,000-4,200 vehicles/hour) and reduces the likelihood of traffic jams.

So far works have been completed on approximately 28 km of the southbound carriageway from Trento Centro to the tolling station of Rovereto South. The works on this section consisted in the widening of the hard shoulder to 3.5 metres and in the installation of variable message signs, video surveillance systems and devices for traffic and weather conditions monitoring. Furthermore, adaptation works have also been completed on the acceleration and deceleration lanes of the Nogaredo West service area, new emergency lay-bys have been built and safety barriers have been installed.

The tests carried out on this trial section were successful. Autostrada del Brennero SpA is therefore drawing up an executive plan to adapt the Rovereto South-Affi section. This will be followed by the Bolzano South-Egna, Egna-Trento Centre and Affi-Verona sections.

In particular, the works will involve the adaptation of engineering structures, the construction of a new tunnel, the adaptation of the acceleration and deceleration lanes of service areas, the reconfiguration of interchange ramps, the installation of side safety barriers, variable message signs and control systems.


Service
Non-payment report
 
Toll: how is it calculated
 
Facilitations
 
Service Centres
 
Toll redund and billing
 
Electric mobility
 
Truck parks
 
Exceptional transport
 
Electrical charging points
 
Laundry service in Rovereto sud
 
De-icing system
 
unchecked checked calcola pedaggio mancato pagamento fatturazione rimborso agevolazioni centro servizi parcheggi esterni play video play video hover