Salta al contenuto principale

Electric

The investment plan devised to finance the Autostrada del Brennero project to turn the A22 in the first European Green Corridor also focuses on boosting electric charging stations. While polluting emissions are caused by the vehicles driving on the motorway, Autobrennero wants to contribute to the decarbonisation of transport which is occurring around the world. Installing a widespread network of charging stations on the motorway will drive e-mobility and contribute to the goal the European Union has set to slash net greenhouse gas emissions by at least 55% by 2030.

Car Charging Stations

The Brenner Motorway can be defined as a Charging Point Operator (CPO), with 18 charging stations distributed across service areas and near motorway exits. These stations provide 82 parking spaces, in addition to dedicated Tesla bays. Charging is offered at significantly lower prices compared to the national average, ranging from

This demonstrates that, for the A22, electric charging facilities are not merely a business choice but a genuine commitment to the environment and to the communities that rely on it every day.

View on the map

Colonnine-2023-Foto-MarcoParisi6.jpg

Ultra-fast charging (HPC) – up to 180 kW
Connectors: 2 direct current (DC) connectors, CCS Combo 2 standard.
Use: Allows two vehicles to charge at the same time in DC, with dynamic power sharing.

Fast charging (multi-standard) – up to 50 kW (DC) and up to 43 kW (AC)
Connectors: 3 integrated cables. 2 direct current (1 CCS Combo 2 and 1 CHAdeMO) and 1 alternating current (Type 2).
Use: Allows two vehicles to charge at the same time only by combining 1 vehicle in AC and 1 vehicle in DC.

AC charging – up to 22 kW
Connectors: 2 sockets on the charging point (Type 2 socket). Users must use their own cable.
Use: Allows two vehicles to charge at the same time (up to 22 kW for a single vehicle; 11 kW per vehicle if both are used).

MCS (Megawatt Charging System) for heavy goods vehicles – up to 1 MW
Bays served: The hub serves 3 parking bays reserved for heavy goods vehicles.
Connectors: 1 very high-power 1 MW MCS connector (specific to trucks) and
high-power CCS Combo 2 connectors (up to 600 kW).

Ultra-fast charging (HPC)
€ 0.43/kWh

Multi-standard charging
€ 0.38/kWh

AC charging
€ 0.33/kWh

Heavy goods vehicles (MCS charging point at Bolzano Sud, only for vehicles authorised by A22)
€ 0.43/kWh

App rEVcharge

Recharge worry-free. Find, charge and pay from your smartphone.

rEVcharge_logo.png

rEVcharge is the official Brennero Motorway app to recharge electric vehicles along the A22 Brennero-Modena. Practical and intuitive, this service is designed to keep your journey smooth, efficient and without interruptions.

Info: [email protected] 

  • Find the available charging points along your route and check in real time whether they are free or busy

  • Choose the one that best fits your stop

  • Start the recharge from your smartphone

  • During your stop, check the status of your recharge in real time

  • Pay in a few taps directly from the app

At the end, your full session summary is saved on your phone, together with the full history of your consumption and costs. Find, recharge, pay… in a few taps.

Available on App Store and Google Play